Industrial Facility
Location: Rochester, NY
Specified Performance:
(1) 28,000 CFM unit @ 6.5" TSP
Project Features:
~ Fast track shipment
~ Outdoor construction
Equipment Performance:
This industrial client and repeat user of Air Enterprises' equipment
needed a unit fast in order to meet project scheduling demands and
to beat anticipated inclement weather conditions during existing
unit transition to the new Air Enterprises equipment.
By patterning the unit after a proven and existing on-site design,
confidence to release long-lead items such as fans and coils was
achieved upon issuance of order. Complete unit release was achieved
within a week. By employing these fast track methods, Air Enterprises
was able to ship a unit (9) weeks after purchase.
Outdoor construction features were also important. Air Enterprises
provided a unit constructed of all aluminum to minimize corrosion
concerns. A sloped rubber roofing membrane with a continuous aluminum
perimeter gutter system with vertical downspouts was provided to
control water run-off and snow melt. A 5' wide by 45' long service
vestibule with heating and ventilation was provided to house VFD's,
electrical equipment, piping, etc... the unit could be serviced
and maintained without service personnel exposure to the weather.
Unit components consisted of return and supply air fans with inlet
flow measuring devices and "panic" stops, energy economizer
section with integral exhaust outside/return air dampers, 30%/85%
filters, chilled water cooling coils with stainless steel casings
and downstream moisture eliminators, copper fin heating coils, and
smoke isolation dampers. VFD fan air volume devices, fluorescent
lights, convenience outlets, and disconnects were factory provided.
Field services included vibration test, start-up, owner training,
and field joining services.
|