Home Login Contact Air Enterprises
Search the Air Enterprises Website:
 
Air Enterprises
Akron, Ohio USA / Dublin, Ireland
 
 

Food/Beverage Facility

Location: Houston, TX

Specified Performance:
(1) 1,100 CFM unit @ 4" TSP

Project Features:
~ One-source responsibility
~ Energy recovery

Equipment Performance:
The repeat beverage client had employed this rotary heat/energy recovery design in the past. Due to desired conditions within the area being served and the amount of air changes demanded, energy recovery to minimize energy consumption was an important design issue. By running the exhaust air and the supply air streams through a rotary energy recovery wheel, both latent and sensible energy recovery occurred offering a recovery efficiency of nearly 85%.

Air Enterprises offered one-source equipment and service responsibility. Internal components consisted of fans, the energy recovery wheel and basic filtration. An internal lighting system was factory provided. Air Enterprises supplied integral controls, photohelic filter monitoring, air flow measuring devices, and energy recovery wheel controls. All items were encased within Air Enterprises' double wall all-aluminum housing with all penetrations to the unit exterior being made and carefully sealed at the factory. When the equipment arrived on site, the client simply "plugged-in" the appropriate utility and the unit was ready to run.

Air Enterprises completed our one-source responsibilities by providing field start-up and owner equipment training services.

 

 

 

 
Engineered for Quality, Engineered to Last
 Copyright © 2005 - 2007, Air Enterprises, LLC. All rights reserved. Privacy Statement